Rocky Plains Observatory Observatory Information - Construction -
Construction took me approximately one year from when I broke ground until the scope was in place and operational. I did almost all of the work on my own, but had some invaluable help for some of the tasks (concrete, roof installation, siding). I was able to get all the groundwork in place prior to the winter (before the ground froze). Over the winter, I completed some of the remaining design details, and pre-fabricated all of the roof components. This included the machining and welding of the wheel beams and tracks, as well as building up the roof trusses. I was able to do all this indoors, so when warmer spring temps arrived I was ready to go. As it turns out, this was a great strategy - the building went up very quickly as a result, and the precision work was already done.
Foundation Info. on all the groundwork and concrete work. Framing Details on the floor and wall construction Roof Construction Pre-Fab and Assembly of the roofs Exterior Finish Work Final Details, Exterior Finishing, and Painting Interior Finish Interior Finish Details (still under construction)
Back to Observatory Info.
|
|
Copyright © 2007 Alpine Astronomical, LLC. All Rights Reserved.
|